Track Works

Track Works’ is one of our strong points in RC Asia Engineering. Below are the areas that we specialize in:

Survey

Establishment of control points and TBM , transfer existing data to carry out construction works.

Collecting  As-Built data.

New Railway Track

Transportation of materials, laying of track, lifting and tamping to complete track profile.

Undercutting of Ballast and Ballast Cleaning

Remove old (contaminated) ballast, lay geotextile and replace with new ballast, lifting and tamping to complete track profile.

Turnouts Installation

Assemble and Install turnouts to newly laid track ( pre-fabricate /  in-situ).  Assemble new turnouts, dismantle current turnouts and replace with new one.

Installation of Level Crossing

Assemble new level crossing, dismantle and replace new  level crossing at existing track.   Installation of Polymer Level Crossing.

Distressing of Rail Track

Rail Tensors and Roller used to stretch existing rail track, cutting off resultant  ( excess rails ) between various track sections.

Track Maintenance

Provide adequate track maintenance team and tools to monitor and maintain the track.

Thermite Welding and Flush Butt Welding

Rails joined to form Long Welded Rails (LWR) by carrying out Thermit / Flash Butt Welding.

Track Diversion

Existing track is slewed / shifted to new alignment, to facilitate construction of new track or rehabilitation.

Track Dismantling

Old (unused) tracks dismantled to single component and stacked at stock yard and maintain necessary records for proper accounting of stock.

Ultrasonic Test

Carry out test on welded railway track joints to identify faults and ensure joints conforms to specifications.

Signaling & Cabling

Laying of various signal cables, terminations and installation of Signal line side equipments.

Installation of Power Rail

Transportation , Distribution of Materials and Installation.

Installation of LIM Rail

Transportation, Distribution of Materials and Installation.

Dismantling, Sorting , Grading of Track Materials and Handing Over

Recovered track materials are dismantled and handed over accordingly as per Permanent Way Manual.

Track Monitoring (TMT)

Effective method of railway track laying, practiced on life-line track to obtain maximum production.

Track Rehabilitation - PQRS System

Railway Tracks are monitored on movement and settlement during construction on or beside the existing track for safe movement of trains.