Track Works’ is one of our strong points in RC Asia Engineering. Below are the areas that we specialize in:
Survey
Establishment of control points and TBM , transfer existing data to carry out construction works.
Collecting As-Built data.
New Railway Track
Transportation of materials, laying of track, lifting and tamping to complete track profile.
Undercutting of Ballast and Ballast Cleaning
Remove old (contaminated) ballast, lay geotextile and replace with new ballast, lifting and tamping to complete track profile.
Turnouts Installation
Assemble and Install turnouts to newly laid track ( pre-fabricate / in-situ). Assemble new turnouts, dismantle current turnouts and replace with new one.
Installation of Level Crossing
Assemble new level crossing, dismantle and replace new level crossing at existing track. Installation of Polymer Level Crossing.
Distressing of Rail Track
Rail Tensors and Roller used to stretch existing rail track, cutting off resultant ( excess rails ) between various track sections.
Track Maintenance
Provide adequate track maintenance team and tools to monitor and maintain the track.
Thermite Welding and Flush Butt Welding
Rails joined to form Long Welded Rails (LWR) by carrying out Thermit / Flash Butt Welding.
Track Diversion
Existing track is slewed / shifted to new alignment, to facilitate construction of new track or rehabilitation.
Track Dismantling
Old (unused) tracks dismantled to single component and stacked at stock yard and maintain necessary records for proper accounting of stock.
Ultrasonic Test
Carry out test on welded railway track joints to identify faults and ensure joints conforms to specifications.
Signaling & Cabling
Laying of various signal cables, terminations and installation of Signal line side equipments.
Installation of Power Rail
Transportation , Distribution of Materials and Installation.
Installation of LIM Rail
Transportation, Distribution of Materials and Installation.
Dismantling, Sorting , Grading of Track Materials and Handing Over
Recovered track materials are dismantled and handed over accordingly as per Permanent Way Manual.
Track Monitoring (TMT)
Effective method of railway track laying, practiced on life-line track to obtain maximum production.
Track Rehabilitation - PQRS System
Railway Tracks are monitored on movement and settlement during construction on or beside the existing track for safe movement of trains.