Past Projects

No Title Client Duration Project Value (RM)
1 Labour Supply For East Residence,KLGCC – Rectification and Upgrading Works for Block G,H,I (39 units) for completion of balance of works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, Mukim Batu Dalam Kuala Lumpur GSIB Sdn. Bhd. June 2013-August 2016          1,000,000.00
2 Specialist Surveyor to carry  Out as built survey at KTMB Railway Tract related of 4th Lane widening at kuang Railway Bridge and Sungai Buloh Bridge Interchange AlloyMtd April – Jul 2016             52,000.00
3 Supply Manpower For Kelana Jaya Line Extension Project. Colas Rail Asia Sdn Bhd April – May 2016           1,500,000.00
4 Overall Roadways And Partial Structural Works For Parcel D for KL Eco City Sdn Bhd (Track Settlement Monitoring Work Ikhmas Jaya Sdn Bhd April 2016-May 2016              100,000.00
5 Labour Supply: Cleaning Work / Traffic Management / CCTV Works Visi Nusajaya Sdn Bhd June 2014 – June 2015              130,000.00
6 Destressing and Welding Works From Paloh to Kulai. KTMB April – June 2015              300,300.00
7 M370-Northern Double Tracking Project Between Ipoh and Padang Besar – Supply of Labour for Temporary Track Diversion. Emrail Sdn.Bhd. June 2010 – Apr 2015         10,000,000.00
8 Proposed Fourth lane Widening Between Sungai Buloh (KM457) and Rawang Interchange (KM443.90)- Package C AlloyMtd July 2014-May 2015              240,000.00
9 Provide Welders and Track Assistance To Carry Out Thermit Welding With The Provided Materials and Tools at Serendah Yard. Plus Order Sdn. Bhd. Dec 2014 – Feb 2015                72,000.00
10 Supply Labors and Tools To carry Out Welding Thermit Work and Destressing Work and All Other Related Work As Per KTMB. Multi Strategy Vision Enterprise Jan – March 2015                85,000.00
11 Proposed Rail Renewal And Associated Works From Batang Benar to Seremban in Central Region KTMB July 2014 – Dec 2014              240,000.00
12 Design, Manufacture, Supply, Deliver, Assemble, Replace, test and Commission Of New 1:6 Shallow Depth Scissor Crossover at Sentul Timur Siding for Ampang Line Unik Kukuh Sdn.Bhd. June – Nov 2014              400,000.00
13 Klang Valley Mass Rapid Transit Project Between Sg.Buloh To Kajang. (SBK-S-06-Trackworks). Package: Depot Trackworks.( To provide Light Weight Tie Tamper and Operator to carry out Tamping Work) GJA-NBCT Rail JV Apr – October 2014              470,000.00
14 Supply of General Unskilled & Skilled workers on daily basis for maintenance of track machines and other miscellaneous works between Seremban – Gemas Section of SGEDT project. Ircon International Limited Mac – August 2014                60,000.00
15 Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Extension and Rehabilitation of Track and Associated Work at Kajang (KTMB) Station ( Track Work ). Touch Tronics Rail And Services Sdn.Bhd. Sept 2013-May 2014           1,600,000.00
16 Electrified Double Track Priject Between Ipoh And Padang Besar Systems- Provision of Manpower Supply for Termination Works Balfour Beatty Oct 2013-April 2014              500,000.00
17 Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Supply of TMT and ERT Team For Extension And Rehabilitated Of Track And Associated Work At Kajang (KTMB) Station. Touch Tronics Rail And Services Sdn.Bhd. Aug 2013- Feb 2014              170,000.00
18 Provide Track Monitoring Team (TMT works) and Emergency response team (ERT) for Track monitoring 24 hours with three teams. B & G Corporation Sdn Bhd Jan-Feb 14           150,000.00
19 Supply And Installation of 6 Nos of Settlement Marker And Carry Out Track Monitoring Work (TMT WORKS) GTS Contractor Sdn Bhd Oct-13            29,000.00
20 Supply Of General workers On Daily Basis For Maintenance Of Existing Railway Track For Package 1: Cleaning of Cess, Boxing and Dressing of shoulder ballast between Sg.Gadut – Rembau. Ircon International Aug-13                42,000.00
21 Work for Temporary/ Permanent Diversion between Seremban to Tampin CH461.234 to CH500.400:Electrified Double Track Project from Seremban to Gemas(Package A) Ircon International Feb 2010 – Jul 2013           8,000,000.00

22 TrackWork for Main Line Track for Electrified Double Track in Tampin to Batang Melaka sectiob from CH510800 to CH535500, Package B. Ircon International May 2011-Jul 2013           7,700,000.00
23 Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Construction of Approach Road and Other Related Works for Electrical Feeder Station at Batang Melaka. Ircon International June-July 2013              290,000.00
24 Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Signalling, Trenching, cable Lying and Asscociated work Between Sg.Gadut and Rembau Station. Fabricontrol Const.(M) Sdn Bhd May-Nov 2011           1,260,000.00
25 Track upgrading & Associated works at Plentong Station. KTM Tanah Melayu Berhad. April – Jun 2011              190,000.00
26 Extention of 3rd loop lines and associated works at KEMPAS bahru station. KTM Tanah Melayu Berhad. April- Jun 2011              118,000.00
27 To supply manpower for installation of Kelana Jaya mainline Optical Fibre Cable. Bombardier (M) Sdn.Bhd. March – June 2010              271,000.00
28 Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Supply of general workers on daily basis for maintenance of existing railway track. Ircon International Limited Feb2009-Feb2010              288,000.00
29 Proposed to install reinforcing beam to strengthen the both buffer stop of Star LRT Track at Ampang Station. Unik Kukuh Sdn.Bhd. Dec2009-Jan2010              170,000.00
30 M370-Northern Double Tracking Project between Ipoh and Padang Besar – Supply of labours for Temporary Track Diversion. Emrail Sdn. Bhd. June2009-May2010              350,000.00
31 Rehabilitation and strengthen of track and associated works between Seremban and Rembau Railway Station. AKS Sepakat Sdn. Bhd. May2009-Dec2009           1,700,000.00
32 Unloading & Stacking of rails at Seremban Yard (Double Track Gemas to Seremban ). Kuala Freight Sdn. Bhd. Oct2008-Jan2009              110,000.00
33 Provide labours, tools, transporation and accommodation to carry out at LRT Extension Line Subang. Hisniaga Sdn.Bhd. Sept2008-Feb2009              200,000.00

34 Provide labours, tools, machinery to unload and dismantle recovered wooden track, sorting according to various grade and components and stacking at yard.(Rehabilitation & strengthening of Railway Track and associated from Seremban to Rembau Railway Station). AKS Sepakat Sdn. Bhd. Nov2008-April2009              325,000.00
35 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Jan2009-June2009              100,000.00
36 Electrified Double Track Project between Ipoh – Padang Besar (Jarak Rail Storage Yard) MMC – Gamuda Joint Venture Sdn. Bhd Jan2009-June2009              254,000.00
37 Rehabilitation and strengthen of track and associated works between Rembau to Gemas Railway Station.Track strengthening works at Station Main Line (Kendong, Tampin, Batang Melaka, Tebong and Air Kuning Station) Hisniaga Sdn.Bhd. Nov2008-Feb2009              390,000.00
38 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Jan2008-Dec2008              448,000.00
39 To provide labours, tools, transportation and accommodation to carry out Rail Stacking at Jarak Stock Yard for MMC-Gamuda Jv. Hisniaga Sdn.Bhd. Aug-Dec2008              130,000.00
40 Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Tender for Construction and Establishment of Rail Stacking Yard in existing Seremban Railway Yard. Ircon International Limited Sept2008-Nov2008              608,000.00
41 Dismantling of recovered wooden sleeper panels stacked at various station yards, sorting according to various grade and component and stacking at the station yards.(Gemas to Tampin) Hisniaga Sdn.Bhd. June2008-Dec2008              370,000.00
42 Track strengthening work between Railway Station Alor Star – Padang Besar. Hisniaga Sdn.Bhd. Sept2008-Dec2008              195,000.00
43 Spot renewal using 2,500 units of Grade “B” timber sleepers starting from Junun Railway Station. Hisniaga Sdn.Bhd. Aug-Dec2008                45,000.00
44 Rehabilitation and strengthening of track and associated works between Rembau to Gemas Railway Station. Track strengthening works at Station Main Line (Kendong & Tampin) Hisniaga Sdn.Bhd. Sept2008-Oct2008              270,000.00
45 Installation of Office Cabin, Fencing and related works at Petaling Jaya Railway Station for storing documents. Ircon International Limited June-Aug2008                62,000.00

46 Spot renewal of 1,600 units of timber sleepers on curves between railway stations Seremban – Rembau in Sounthern Region. KTMB May2008-Aug2008                48,000.00
47 Rehabilitation and strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Destressing Works Lion Pacific Engineering Sdn.Bhd. Nov2007-Aug2008              270,000.00
48 Level Crossing, approach mud pumping and installation of Junction Rail. Lion Pacific Engineering Sdn.Bhd. Mac-  May2008                90,000.00
49 Destressing works between Tampin to Batang Melaka Hisniaga Sdn.Bhd. Mac2008-May2008              218,000.00
50 Rehabilitation and strengthening of track and associated works between Seremban and Rembau Railway Station AKS Sepakat Sdn. Bhd. Mac2008-Aug2008           1,590,000.00
51 Jungle felling between SPK-P.Klang and SPK-Seremban KTMB Sept2007-Jan2008              190,000.00
52 Track Formation Rehabilitation Works at Mud Pumping, Bridge approach & station mainline between Bukit Mertajam and Parit Buntar. Ircon International Limited March – Jan 2008              319,000.00
53 Track Rehabilitation & Strengthening – Complete Track Renewal (CTR) Work with UIC 54kg rail, PSC sleeper & distressing between Parit Buntar – Bukit merah and Bukit Merah – Taiping Stations. Ircon International Limited Jan2007-April2008           2,500,000.00
54 Construction of PQRS panel assembly & stockpile yard and other allied facilities at Taiping Station Yard. Ircon International Limited July 2007 – Jan 2008              500,000.00
55 Track rehabilitation & Strengthening – construction of Stockpile Yard, Panel Assembly & FB Welding Depot and other allied facilities at Parit Buntar Station Yard. Ircon International Limited Feb2007 – Jan2008              256,000.00
56 Track Rehabilitation & Strengthening – Earthwork & Track work for raising and renewal of track by laying temporary diversion between Parit Buntar-Bukit Merah and Bukit Merah-Taiping Stations. Ircon International Limited Feb – Dec2007           3,199,000.00
57 Rehabilitation & strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Drainage Works Lion Pacific Engineering Sdn.Bhd. March-June2007              157,000.00

58 Track formation rehabilitation, mud pumping, bridge approach & station mainline works between Bukit Merah and Taiping Station. Lion Pacific Engineering Sdn.Bhd. Dec2006-July2007              528,000.00
59 Track formation rehabilition works at Mud Pumping, Bridge approach & station mainline between Parit Buntar and Bukit Merah Station. Ircon International Limited Nov2006-Aug2007              458,000.00
60 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Jan – Dec2007              326,000.00
61 Track strengthening work (sleeper changing) between Railway Station Tampin. KTMB Oct – Dec2006              126,000.00
62 Track strengthening work (sleeper changing) between Railway Station Alor Star – P.Besar. KTMB Oct – Dec2007              189,000.00
63 Construction of Sewage Treatment Plant Project Phase 2 – P3C2 Kuala Sawah. Jua Yakin Sdn. Bhd. May 2006                36,000.00
64 Rehabilitation of Track Formation and Associated Works between Tenang to Labis Railway Station, Johor. Escade Construction Sdn. Bhd. Apr-May2006              159,000.00
65 Replacement of Ballast & Associated Works between Kerdau to Sg.Yu,Pahang. Emrail Sdn. Bhd. Oct2002-Aug2005         18,000,000.00
66 Double Tracking Work between Rawang to Ipoh (maintenance team). Emrail Sdn. Bhd. Dec2005-Dec2006           1,200,000.00
67 Jungle felling between Rawang – K.Lumpur, Sentul-P.Klang and K.Lumpur-Seremban. KTMB Nov2005-Apr2006              148,000.00
68 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Dec2004-Nov2005              836,000.00
69 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Oct2003-Dec2004           1,300,000.00
70 Double Tracking Work between Rawang to Ipoh (maintenance team) Emrail Sdn. Bhd. Dec2002-Dec2003           1,100,000.00
71 Upgrading of Track between Seremban – Tampin Pretech Sdn.Bhd. June – Dec2002              225,000.00
72 Upgrading of Track between Tampin – Gemas Noble Diginity Sdn.Bhd. April – Sept 2002              180,000.00